Andres – T130a (With changes)

There was a suitable project in Timber’s project bank, the room layout of which could be adapted to our needs. The project was also suitable for placement on the property.

Type of architectural project

Changes: Layout of pantry, sauna, shower, laundry and utility room

Customer feedback

Room solution
5/5

As far as possible, the execution was good. The steam room could have been a little bigger, the laundry room is a good size, the anteroom/utility room of the sauna could have been a few squares bigger.

External solution
5/5

Just as a recommendation, the price should be planned immediately for the additional coating of the outer lining and wind boxes, or it should be covered twice at the factory so that the wood surface does not shine through.

Read more